Laserfiche WebLink
Susan Burgmaier <br />- 2 - February 15, 2013 <br />2. DRMS - Several maps will need to be updated with the new permit boundary. <br />Map 3 - Vegetation - needs to be updated with the revised permit boundary. Prior to <br />any surface disturbance in this area, vegetation baseline studies will need to be <br />conducted (see Item 3 below). <br />Map 4- Soils - needs to be updated with the revised permit boundary. Prior to any <br />surface disturbance in this area, soil resources will need to be inventoried and <br />mapped (see Item 3 below). <br />Map 5 - Surficial Geology - needs to be updated with the revised permit boundary. <br />Prior to any surface disturbance in this area, the surface geology will need to be <br />provided. <br />Map 06 - Geologic Hazards <br />Map 07 - Geology <br />A revised Map 09, Hydrological Monitoring Location Map, was submitted with this <br />PR13 application, but the map has the currently approved permit boundary. Please <br />revise the map to show the PR13 proposed permit boundary. <br />Map 12 - Premining Land Use <br />Map 13 - Postmining Land Use <br />Map 23, Water Rights Location, and Map 23A, Water Rights Location Wells, will <br />need to be updated with the new permit boundary and to include all water supply <br />intakes, ditches, reservoirs, and wells within a one mile minimum radius of the <br />affected area of the permit boundary expansion. <br />Map 25 - Previously Mined Areas <br />Map 27 -B, which depicts subsidence monitoring points, should be updated to reflect <br />the revised permit boundary and the proposed monitoring points for the expansion <br />area. <br />BRL - The maps were updated as requested. <br />3. DRMS - This permit revision does not include any proposals for additional surface <br />disturbance. Should BRL contemplate any future surface disturbance in the <br />expansion area (gob vent borehole, fan shaft, escape shaft, etc.), the following will <br />need to be addressed: <br />a. The fish and wildlife information required by Rules 2.04.11 and 4.18 will need to <br />be submitted. Specifically, BRL must address any potential Threatened and <br />Endangered species present in the area prior to any ground disturbance. <br />b. SHPO clearance must be obtained prior to any surface disturbance. <br />c. The soils information required by Rules 2.04.9 and 4.06. The entire expansion <br />area proposed in PR13 and previously approved expansion area of PR12 appear <br />to be included in Map 9 -3 of the Bowie No. 1 permit application package. This <br />information may be useful for insertion in the Bowie No. 2 permit. <br />d. The vegetation information required by Rules 2.04.10 and 4.15. This information <br />appears to have been addressed on Map 9A -1 (including supporting text) of the <br />Bowie No. 1 permit application package, and may be useful for updating the <br />Bowie No. 2 permit. <br />