cc <br />&v <br />B) Underground Workings <br />During the reporting period the contractor continued to work around the vicinity of historical underground working , <br />opening #372 Amec #5126, winding the ADR haul route. At approximately 1500hrs on Feb 8th a D6 dozer cut 2 drill <br />rig platforms for delineation drilling. Schedule for delineation drilling to is set for Monday the 11th of February and will <br />continue to follow up. <br />No other underground workings were remediated during this reporting period. <br />C) Highway 67 <br />Tree removal continues in the area of HWY 67 Realignment Project. An Amec Field Representative observed tree <br />removal in the area of the embankment thru the reporting period. This work is to be ongoing in preparation of the <br />HWY 67 realignment project. <br />On Monday, February 4th, two Compressive strength breaks were performed in our laboratory for the previously <br />placed (Jan 31st) concrete which was placed for the east pad of the temporary concrete crossing as part of existing <br />state Hwy 67. <br />Results are as follows: <br />Specimen: Hwy67 -3 -1, Age 3 days, Load 44990 Ibs, Strength 3580 psi, 85% of design strength. <br />Specimen: Hwy67 -4 -1, Age 3 days, Load 51490 Ibs, Strength 4100 psi, 98% of design strength <br />On Tuesday, February 5th, two Compressive strength breaks were performed in our laboratory for the previously <br />placed concrete (Jan 221 which was placed for the west pad of the temporary concrete crossing as part of existing <br />state Hwy 67. <br />Results are as follows: <br />Specimen: Hwy67 -2 -3, Age 14 days, Load 54130 Ibs, Strength 4310 psi, 103% of design strength. <br />Specimen: Hwy67 -1 -3, Age 14 days, Load 36040 Ibs, Strength 2870 psi, 68% of design strength <br />On Thursday, Feb 7th, two Compressive strength breaks were performed in our laboratory for the previously placed <br />concrete (Jan 31st) which was placed for the east portion of the highway crossing as part of existing state Hwy 67. <br />Results are as follows: <br />Specimen: Hwy67 -3 -2, Age 7 days, Load 48525 Ibs, Strength 3860 psi, 92% of design strength <br />Specimen: Hwy67 -4 -2, Age 7 days, Load 55300 Ibs, Strength 4400 psi, 105% of design strength <br />Compressive strength testing will continue to be performed on scheduled testing days until complete. <br />On February 7th, MHT #3 was removed allowing traffic to pass on the south and north lanes of existing Hwy 67.. <br />Timed Traffic lights were installed on each end of the crossing and are manually operated at this time. <br />No other work was performed for the existing HWY 67 crossing during this reporting period. <br />H) Storm Water Management <br />amec9 <br />A) Best Management Practices (BMP) are being performed. Inspections continue and there have been no <br />issues identified. <br />Page 2 of 6 MLE2 WE 02.09.13.doc <br />