Laserfiche WebLink
TABLE 2 <br />2011 PERMITTED VERSUS 2012 ACTUAL AREA IMPACT SCHWARTZWALDER MINE <br />TREE AND SHRUB IMPACT <br />* Upland Shrub Replacement Number is Higher because one 0.08 Acre Existing Upland Area is Being Planted with 150 Upland Shrubs as Mitigation for Permanent Upland Impact. <br />This number includes these 150 Upland Shrubs plus the 58 Upland Shrubs Needed for Direct Shrub Impact. <br />2011 Permitted <br />Tree and Shrub <br />Impact <br />2011 Permitted <br />Tree and Shrub <br />Replacement <br />Required (Variety <br />of Ratios) <br />2011 Permitted <br />Phases 1 and 2 <br />Mitigation <br />2011 Permitted <br />Phase 3 <br />Mitigation <br />2012 Actual Tree <br />and Shrub Impact <br />2012 Actual Tree <br />and Shrub <br />Replacement <br />Required (Variety <br />of Ratios) <br />2012 Actual Tree <br />and Shrub <br />Mitigation Phase <br />1 <br />2012 Actual Tree <br />and Shrub <br />Mitigation Phase <br />3 <br />Upland Trees <br />10 <br />18 <br />18 <br />2 <br />2 <br />2 <br />Upland Shrubs <br />86 <br />120 <br />270 <br />37 <br />58 <br />208* <br />Riparian Trees <br />172 <br />252 <br />40 <br />212 <br />131 <br />194 <br />20 <br />174 <br />Riparian Shrubs <br />747 <br />1,120 <br />120 Riparian <br />Shrubs and 1,000 <br />Willow Stakes <br />590 <br />885 <br />120 Riparian <br />Shrubs and 150 <br />Willow Stakes <br />615 Willow Stakes <br />TABLE 2 <br />2011 PERMITTED VERSUS 2012 ACTUAL AREA IMPACT SCHWARTZWALDER MINE <br />TREE AND SHRUB IMPACT <br />* Upland Shrub Replacement Number is Higher because one 0.08 Acre Existing Upland Area is Being Planted with 150 Upland Shrubs as Mitigation for Permanent Upland Impact. <br />This number includes these 150 Upland Shrubs plus the 58 Upland Shrubs Needed for Direct Shrub Impact. <br />