Laserfiche WebLink
CC &V PROJECT NO. SC -07 -002 January 4, 2013 <br />CRIPPLE CREEK AND VICTOR GOLD MINING COMPANY <br />CDOT STANDARD SPECIAL PROVISIONS <br />STATE HIGHWAY 67 <br />Revision of Section 105 and 106 — Conformity to the Contract of Hot <br />Mix Asphalt (Less than 5000 Tons) <br />Revision of Section 106 — Certificates of Compliance and Certified <br />Test Reports <br />Revision of Section 212 — Seed <br />Revision of Section 401 — Compaction of Hot Mix Asphalt <br />Revision of Section 401 — Compaction Pavement Test Section (CTS) <br />Revision of Section 401 — Temperature Segregation <br />Revision of Sections 401 and 412 — Safety Edge <br />Revision of Sections 603, 624 and 705 — Drainage Pipe <br />Revision of Section 612 — Delineators <br />Revision of Section 627 and 708 — Pavement Marking with <br />Waterborne Paint and Low VOC Solvent Base Paint <br />Revision Of Section 630 — Construction Zone Traffic Control <br />Revision of Section 630 - Retroreflective Sign Sheeting ( with Type <br />VI sheeting <br />Revision of Section 703 — Aggregate for Hot Mix Asphalt <br />Revision of Section 712 — Geotextiles <br />2 <br />No. of <br />Pages <br />(September 29,2011) 7 <br />(February 3, 2011) 1 <br />Date <br />(April 26, 2012) <br />(April 26, 2012) <br />(February 3, 2011) <br />(February 3, 2011) <br />(September 23, 2011) <br />(April 26, 2012) <br />(February 3, 2011) <br />(February 3, 2011) <br />(February 17, 2012) <br />(February 3, 2011) <br />(June 16, 2011) <br />(January 20, 2012) <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />