Laserfiche WebLink
Southfield C1981014: MT6 15 February 19, 2013 <br />amount of bond held of $380,431.00 is statutorily limited by the 60 percent maximum criteria <br />as required by Rule 3.03.1(2)(a) and may not be decreased without being approved through <br />the Bond Release process. Based on the above referenced 2013 Midterm (MT6) Review <br />Cost Estimate, the Division holds an adequate amount of bond to complete the remaining <br />reclamation required at the Southfield Mine. <br />This concludes the 2013 Midterm Review of the Southfield Mine. Please submit a technical <br />revision responding to the issues outlined in Section V within 45 days <br />