Laserfiche WebLink
Scraper Worksheet Cont'd <br />Job Hours: <br />Task # 011 <br />Page 43 of 43 <br />36.00 Total Cost: $9,736.72 <br />CIRCES Cost Estimating Software <br />diameter borehole <br />Cut Casing at <br />Surface <br />Exposed casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />4" <br />NA <br />2.00 <br />LF <br />$5.87 <br />$11.74 <br />Borehole <br />Marker <br />Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA <br />NA <br />2.00 <br />EA <br />$2.81 <br />$5.62 <br />Drill Rig and <br />Labor <br />SCHRAMM <br />T450BH <br />NA <br />NA <br />8.00 <br />EA <br />$193.25 <br />$1,546.00 <br />Water Truck <br />Water Tanker, 2,500 <br />Gal. <br />NA <br />NA <br />8.00 <br />EA <br />$29.58 <br />$236.64 <br />Surface Plug <br />Portland cement <br />grout - 4 in. (labor, <br />equip, materials) <br />4" <br />150 <br />5.00 <br />LF <br />$7.82 <br />$39.09 <br />Bottom Plug <br />PVC plug - 4 in. <br />diameter borehole <br />4" <br />NA <br />1.00 <br />EA <br />$28.45 <br />$28.45 <br />Cut Casing at <br />Surface <br />Exposed casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />4" <br />NA <br />1.00 <br />LF <br />$5.87 <br />$5.87 <br />Borehole <br />Marker <br />Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA <br />NA <br />1.00 <br />EA <br />$2.81 <br />$2.81 <br />Drill Rig and <br />Labor <br />SCHRAMM <br />T450BH <br />NA <br />NA <br />4.00 <br />EA <br />$193.25 <br />$773.00 <br />Water Truck <br />Water Tanker, 2,500 <br />Gal. <br />NA <br />NA <br />4.00 <br />EA <br />$29.58 <br />$118.32 <br />Scraper Worksheet Cont'd <br />Job Hours: <br />Task # 011 <br />Page 43 of 43 <br />36.00 Total Cost: $9,736.72 <br />CIRCES Cost Estimating Software <br />