Laserfiche WebLink
0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Scraper Worksheet Cont'd <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 0.3890 <br />Adjusted unit production: 681.84 LCY /hr <br />Adjusted fleet production: 681.84 LCY /hr <br />1 Dozer(s) <br />$0.378/LCY <br />0.99 Hours <br />$255.28 <br />Task # 011 <br />Page 24 of 43 <br />CIRCES Cost Estimating Software <br />