Laserfiche WebLink
Scraper Worksheet Cont'd Task # 011 Page 17 of 43 <br />Task description: <br />Site: Southfield Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />035 <br />2/14/2013 <br />2:40:37 PM <br />JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />Average push gradient: <br />Average site altitude: <br />Backfill and Regrade Pond 4 <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />$265.84 <br />$265.84 <br />MATERIAL QUANTITIES <br />14,000 <br />1.125 <br />15,750 LCY <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />0% <br />6,100 feet <br />$78.33 <br />$142.13 <br />$7.96 <br />$37.41 <br />125 feet <br />1,055.6 LCY/hr <br />Material weight: 2,650 lbs /LCY <br />Cat Handbook <br />BULLDOZER WORK <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Permit Action: 2012 Midterm Review Permit/Job #: C1981014 <br />State: Colorado <br />County: Fremont <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Division of Reclamation, Mining & Safety <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Job Condition Correction Factor Source <br />Abbreviation: None <br />Filename: C014 -035 <br />CIRCES Cost Estimating Software <br />