Laserfiche WebLink
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />600.00 <br />-6.00 <br />3.00 <br />-3.00 <br />2938 <br />0.27 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />600.00 <br />6.00 <br />3.00 <br />9.00 <br />1930 <br />0.39 <br />Scraper Worksheet Cont'd Task # 011 Page 6 of 43 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />JOB TIME AND COST <br />Fleet size: 1 <br />0.830 <br />NA <br />0.90 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 1,047.22 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Team(s) Total job time: <br />Unit cost: $0.776 /LCY Total job cost: <br />0.27 minutes <br />0.39 minutes <br />2.16 minutes <br />869.19 LCY/Hour <br />2 Scraper(s) <br />869.19 LCY/Hour <br />869.19 LCY/Hour <br />7.77 <br />$5,240.45 <br />Site Altitude: 6100 feet <br />Hours <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 011 Page 6 of 43 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />JOB TIME AND COST <br />Fleet size: 1 <br />0.830 <br />NA <br />0.90 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 1,047.22 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Team(s) Total job time: <br />Unit cost: $0.776 /LCY Total job cost: <br />0.27 minutes <br />0.39 minutes <br />2.16 minutes <br />869.19 LCY/Hour <br />2 Scraper(s) <br />869.19 LCY/Hour <br />869.19 LCY/Hour <br />7.77 <br />$5,240.45 <br />Site Altitude: 6100 feet <br />Hours <br />CIRCES Cost Estimating Software <br />