Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />011 <br />035 <br />036 <br />037 <br />038 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />053 <br />060 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />073 <br />074 <br />Replace Topsoil from Stockpile to Refuse Pile <br />SCRAPER1 <br />...... v-I 1-4 e-i v-I v-I 1-1 I.. ...... 1-.1 v-1 <br />25.41 <br />$17,147.91 <br />$10,196.31 <br />$1,820.71 <br />$1,327.99 <br />$255.28 <br />$5,240.45 <br />$6,793.17 <br />$11,732.78 <br />$13,082.40 <br />$5,604.37 <br />$2,765.79 <br />$9,736.71 <br />$9,216.00 <br />$82,274.63 <br />$25,220.70 <br />$3,206.12 <br />$2,866.32 <br />$80.18 <br />$9,429.60 <br />$6,946.35 <br />$4,700.48 <br />Backfill and Regrade Pond 4 <br />DOZER <br />38.36 <br />Backfill and Regrade Pond 5 <br />DOZER <br />7.06 <br />Backfill and Regrade Pond L -1 <br />DOZER <br />5.15 <br />Backfill and Regrade Pond L -2 <br />DOZER <br />0.99 <br />Replace Topsoil from Stockpile Ll to East <br />Loadout <br />SCRAPER1 <br />7.77 <br />Replace Topsoil from Stockpile L2 to West <br />Loadout <br />SCRAPER1 <br />10.07 <br />Replace Topsoil from Stockpile M -1 to Facilities <br />Area <br />SCRAPER1 <br />17.39 <br />Replace Topsoil from Newlin CkStockpile to <br />Facilities Area <br />SCRAPER1 <br />16.50 <br />Replace Topsoil from Stockpile M -3 to Ponds 3 <br />and 4 <br />SCRAPER1 <br />8.31 <br />Replace Topsoil from Newlin Ck Stockpile to <br />Ponds 3 and 4 <br />SCRAPER1 <br />4.10 <br />Plug and Seal All Boreholes <br />BOREHOLE <br />36.00 <br />Demolish and Remove All Structures <br />DEMOLISH <br />125.00 <br />Reseed Facilities and Loadout Areas <br />REVEGE <br />125.60 <br />Reseed Areas of Refuse Pile Previously Seeded <br />REVEGE <br />60.00 <br />Plant Shrubs and Trees at Facilities Area <br />REVEGE <br />39.60 <br />Plant Shrubs and Trees on Refuse Pile <br />REVEGE <br />72.00 <br />Plant Trees at Loadout <br />REVEGE <br />30.20 <br />Site Maintenance <br />SITEMAINT <br />ENANCE <br />120.00 <br />Mobilize/Demobilize Equipment for Remaining <br />Reclamation <br />MOBILIZE <br />4.50 <br />Mobilize/Demobilize Equipment for Site <br />Maintenace <br />MOBILIZE <br />4.50 <br />SUBTOTALS: <br />758.51 <br />$229,644.25 <br />Task description: MT6 <br />Site: Southfield Mine <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/14/2013 County: Fremont <br />3:37:08 PM <br />User: JHB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />COST SUMMARY WORK <br />Abbreviation: None <br />Page 1 of 43 <br />Permit Ac 012 Midterm <br />Review Permit/Job #: C1981014 <br />Filename: C014 -000 <br />CIRCES Cost Estimating Software <br />