Laserfiche WebLink
Permittee Name: <br />The Denver Brick <br />Company c/o Acme Brick <br />Company <br />Permit Number: <br />M- 1997 -007 <br />Operation Name: <br />Bijou Clay Mine <br />County: <br />Elbert <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />February 19, 2013 <br />Permit Acreage: <br />33.75 <br />Current Bond Amt: <br />$196,124.37 <br />Total acres <br />backfilled: <br />^ � y, <br />Total acres 1 <br />seeded w/ <br />approved mix: <br />-J45 <br />Total acres <br />w /topsoil <br />replaced: <br />Total acres <br />mulched w/ <br />approved mulch: <br />15 Z <br />Total acres <br />graded: <br />" /'.b S <br />Total acres <br />fertilized w/ <br />1 apvd fertilizer: <br />Topsoil <br />replacement <br />depth (in.): <br />0 <br />Mulch application <br />rate (tons /ac): <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1 ,�2) G NO <br />X62 1 9 2013 <br />3. Is the mine site in final reclamation (all material extraction and stoclipAje - ► • val is complete)? YES <br />. ' <br />If "YES," please note time limits related to completion of reclamation, • -, c LAMATI ON <br />SAFEry <br />4. What was the date of last excavation, processing <br />5. Does the mine operate more than 180 days per year ? - r,( js jA ir►I` 4 11 °" 11 1 y a re......1 <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. /44•101 � riuJ6tC4S /Z <br />Qt e-d see.t.ni x. • 26-7S 10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />112c Annual Report <br />activity at the mine? <br />1 <br />of - <br />Page 2 of 4 <br />/1- /$ -/z <br />YES <br />zsi <br />YES (EitO <br />O <br />NO <br />1%* / ,1a <br />