Land Status Category
<br />Last Years
<br />Cumulative Total
<br />This Calendar
<br />Year
<br />Cumulative Total
<br />Acres disturbed
<br />460.50
<br />+
<br />0.23
<br />=
<br />460.73
<br />Acres backfilled and graded
<br />135
<br />+
<br />5.35
<br />=
<br />141.09
<br />Acres topsoiled
<br />135.
<br />+
<br />5.35
<br />=
<br />141.09
<br />Colorado Division of Reclamation, Mining and Safety
<br />Annual Reclamation Report for the Year 2012
<br />Deserado Mine
<br />mine name
<br />Address: 3607 County Road 65; Rangely, CO 81648
<br />C- 1981 -018 Blue Mountain Energy, Inc.
<br />permit # Permittee
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of the acreage reported
<br />under each land status category and year of seeding (if applicable) should be clearly and accurately
<br />identified on a map included with the report.
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for
<br />each category below. Do not include acres that have achieved final, Phase III release.
<br />*include, if necessary, a description of any augmented seeding or cultural practices
<br />For the Entire Life of Mine, the total number of acres disturbed 460.73 and the total number of acres:
<br />Phase I released 0 Phase II released 0
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed NA
<br />For Government Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 2 326.63
<br />Acreage in active mining areas 3 0
<br />' (exclude acres where Phase Ill release has been achieved)
<br />2 Includes haul and access roads; temporary dams and impoundments, permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking, coal stockpiles, loading, and processing areas, railroads; coal conveyors; nonbackfilled and
<br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways;
<br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Phase III released 0
<br />Includes:
<br />2011 LTMRF acres 326.40
<br />Dewatering pond facilities 0.23
<br />Last Years
<br />Cumulative
<br />Total
<br />This
<br />Calendar
<br />year
<br />Cumulative
<br />Total'
<br />10 years or
<br />less
<br />Greater
<br />than 10
<br />years'
<br />Acres seeded*
<br />135.74
<br />+
<br />5.35
<br />=
<br />141.09
<br />=
<br />26.26
<br />+
<br />114.83
<br />Colorado Division of Reclamation, Mining and Safety
<br />Annual Reclamation Report for the Year 2012
<br />Deserado Mine
<br />mine name
<br />Address: 3607 County Road 65; Rangely, CO 81648
<br />C- 1981 -018 Blue Mountain Energy, Inc.
<br />permit # Permittee
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of the acreage reported
<br />under each land status category and year of seeding (if applicable) should be clearly and accurately
<br />identified on a map included with the report.
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for
<br />each category below. Do not include acres that have achieved final, Phase III release.
<br />*include, if necessary, a description of any augmented seeding or cultural practices
<br />For the Entire Life of Mine, the total number of acres disturbed 460.73 and the total number of acres:
<br />Phase I released 0 Phase II released 0
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed NA
<br />For Government Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 2 326.63
<br />Acreage in active mining areas 3 0
<br />' (exclude acres where Phase Ill release has been achieved)
<br />2 Includes haul and access roads; temporary dams and impoundments, permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking, coal stockpiles, loading, and processing areas, railroads; coal conveyors; nonbackfilled and
<br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways;
<br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Phase III released 0
<br />Includes:
<br />2011 LTMRF acres 326.40
<br />Dewatering pond facilities 0.23
<br />
|