Laserfiche WebLink
Tracking <br />ID <br />Compliance <br />Type <br />Due date* <br />Category <br />Complied with <br />type <br />Background Summary <br />CM30 <br />Commitment <br />0 <br />General Hydrology Report <br />Future <br />CONTAMINATED FLUIDS FORM THE LEAK DETECTION SYSTEM TRENCHES AND SUMPS SHALL BE <br />DISPOSED OF AS FOLLOWS. UP TO 10 GAUMIN OF EFFLUENT COLLECTED FORM THE LEAK <br />DETECTION SYSTEM MAY BE INTRODUCED INTO THE HEAP LEACH SOLUTION CIRCUIT. <br />CONTAMINATED FLUIDS COLLECTED FROM THE LEAK DETECTION SYSTEM IN EXCESS OF 10 <br />GAL /MIN SHALL BE COLLECTED, SOTRED (NOT TO EXCEED 60 DAYS), DETOXIFIED AND RELEASED, <br />IN ACCORDANCE W /THE PLAN FOR CONTAMINATED FLUIDS FORM THE AREQUA GULCH <br />UNDERDRAIN. ALL FLUIDS INTRODUCED FROM THE SYSTEM IN THE LEACH SOLUTION <br />CM31 <br />Commitment <br />0 <br />General Hydrology Report <br />Future <br />IN THE EVENT THAT ANY FLUID IS ENCOUNTERED IN THE LEAK DETECTION SYSTEM, THE <br />FREQUENCY OF MONITORING IN WELLS SURROUNDING THE HEAP LEACH SHALL BE INCREASED, <br />AT A FREQUENCY ACCEPTABLE TO THE OFFICE. THE PERMITTEE SHALL INFORM THE OFFICE <br />WITHIN 24 HOURS FOLLOWING THE DETECTION OF FLUID IN THE LEAK DETECTION SYSTEM. THE <br />PERMITTEE SHALL SUBMIT A PLAN FOR INCREASED MONITORING TO THE OFFICE W/I ONE WEEK <br />FROM THE TIME THE FLUID IS FIRST DETECTED. <br />CM33 <br />Commitment <br />0 <br />Other <br />Future <br />DESIGN AND SPECIFICATION CHANGES, AS DEFINED IN SECTION 6.05 OF THE CQA PLAN AND <br />TECHNICAL SPECIFICATIONS, SHALL ONLY BE MADE WITH WRITTEN AGREEMENT FROM THE <br />OFFICE. <br />CM34 <br />Commitment <br />0 <br />Other <br />Future <br />ALL CERTIFICATION REPORTS AND AS -BUILT DRAWINGS WILL BE SUBMITTED TO THE OFFICE FOR <br />REVIEW AND ACCEPTANCE WITHIN FIVE WORKING DAYS OF SUCH REPORTS AND DRAWINGS <br />BECOMING AVAILABLE TO THE OPERATOR. <br />CM35 <br />Commitment <br />0 <br />Other <br />Future <br />THE FREQUENCY OF PERMEABILITY TESTING FOR SOIL LINER FILL WILL BE ONE TEST FOR EACH <br />5000 CUBIC YARDS OF FILL UNTIL SUCH TIME THAT THE OFFICE APPROVES A LOWER FREQUENCY <br />FOR TESTING. SUCH APPROVAL WOULD BE BASED UPON A DEMONSTRATION OF CONSISTENCY <br />IN THE INITIAL RESULTS. <br />CM36 <br />Commitment <br />0 <br />Other <br />Future <br />UNDERDRAIN MATERIAL MUST BE DURABLE <br />CM40 <br />Commitment <br />0 <br />Other <br />Future <br />OPERATOR WILL PROVIDE ADEQUATE HEAP DETOX <br />CM45 <br />Commitment <br />0 <br />Certification / Inspection <br />Future <br />LOB Liner System Enhancement "As -built Report" shall be submitted to DRMS within 60 days after <br />construction is completed. <br />CM47 <br />Commitment <br />4/9/2014 <br />Warranty Adjustment / Release <br />Future <br />Commit to providing an update to the Exhibit L reclamation cost estimate on a biannual (every other year) <br />basis. These updates should include adjustments to the unit cost data and additional "tabs" to address the <br />reclamation costs associated with Technical Revisions approved by the DRMS after the approval of AM -10 <br />CM48 <br />Commitment <br />4/9/2016 <br />Warranty Adjustment / Release <br />Future <br />Commit to providing an update to the Exhibit L reclamation cost estimate on a biannual (every other year) <br />basis. These updates should include adjustments to the unit cost data and additional "tabs" to address the <br />reclamation costs associated with Technical Revisions approved by the DRMS after the approval of AM -10 <br />CM49 <br />Commitment <br />4/9/2018 <br />Warranty Adjustment / Release <br />Future <br />Commit to providing an update to the Exhibit L reclamation cost estimate on a biannual (every other year) <br />basis. These updates should include adjustments to the unit cost data and additional "tabs" to address the <br />reclamation costs associated with Technical Revisions approved by the DRMS after the approval of AM -10 <br />CM50 <br />Commitment <br />4/9/2020 <br />Warranty Adjustment / Release <br />Future <br />Commit to providing an update to the Exhibit L reclamation cost estimate on a biannual (every other year) <br />basis. These updates should include adjustments to the unit cost data and additional "tabs" to address the <br />reclamation costs associated with Technical Revisions approved by the DRMS after the approval of AM -10 <br />ATTACHMENT B <br />CC &V Permit Commitments & Stipulations Summary Report <br />Page 2 of 3 <br />Print Date: 2/15/2013 <br />