My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-12_REVISION - M2010049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010049
>
2013-02-12_REVISION - M2010049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:30 PM
Creation date
2/13/2013 3:36:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010049
IBM Index Class Name
REVISION
Doc Date
2/12/2013
Doc Name
TR-02 ADDITIONAL BOND RESPONSE
From
VARRA
To
DRMS
Type & Sequence
TR2
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 012 - Excavate for Rip Rap Weir Construction <br />Our estimated volume for excavation for rip rap is approximately 7510 CY. This volume was <br />figured as follows: total SF of 54,070 for all three rip rap areas, at a 3.75' depth for the full depth <br />of the weir cross section. <br />Task 013 - Cost to Purchase D50 Rip Rap <br />Our estimated cost to purchase approximately 5510 CY (8265 TONS) of rip rap at $8.00 per ton <br />is $66,120.00. Our estimated cost to haul 8265 TONS of rip rap at $4.25 per ton from the <br />source in Loveland to the site is approximately $35,126.00. Total cost for rip rap purchase and <br />hauling is $101,246.00. <br />Task 014 - Place Rip Rap Bedding Material <br />Provided estimate of $3,684.45 seems appropriate. <br />Task 015 - Place Rip Rap Material <br />Provided estimate of $1,658.00 seems appropriate. <br />Task 016 - Mob/Demob <br />Provided estimate of $3,986.86 seems appropriate. <br />With the above given details, please refigure and send us a new bond estimate. Quotes for the <br />rip rap purchase and haul, Task 013, are attached for your review. Please feel free to contact us <br />with any questions or concerns. Thank you for your assistance with this. <br />Respectfully, <br />Varra C <br />anies, Inc. <br />Brad J.(5nes, P.E. <br />Civil Engineer <br />cc. Christopher L. Varra, President <br />Garrett Varra, Vice President <br />Varra Companies, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.