Laserfiche WebLink
Pickard Pit <br />M- 2012 -048 <br />Revised February 8, 2013 - Revisions shown in bold. <br />Revised Exhibit D - Reclamation Plan <br />EXHIBIT D — Reclamation Plan <br />The primary reclamation plan for the pit is to slope all areas at a slope no steeper than 3:1. The <br />entire pit area will have topsoil replaced, then be returned to dry land farming. <br />a) The pit area has topsoil averaging 4" in depth. That topsoil will be stockpiled and <br />returned during the reclamation process. Since no overburden is anticipated in the <br />mining operation, no overburden will be returned during reclamation. <br />b) Slopes no greater than 3:1 will be left in the completed pit. <br />c) There are no other reclamation treatments to note for this site. <br />A cost estimate for final reclamation has been not been prepared since this pit is operated by a <br />county government. <br />