Laserfiche WebLink
Year <br />Production per <br />year (tons) <br />Phase <br />Comments <br />Length of time to <br />complete (years) <br />2013 <br />- <br />1 <br />Site Preparation, Construct Ponds, Topsoil stripping, build stockpile <br />along northern permit boundary. <br />0.25 <br />2013 <br />104 000 <br />2 <br />Mine in Mining Area 1, stockpile topsoil. Seed the stockpile Place <br />22.1 <br />2035 <br />overburden on the pit floor. <br />2035 <br />104 000 <br />3 <br />Mine in Mining Area 2 place topsoil on the sideslopes and pit floor <br />25.2 <br />2060 <br />of Mining Area 1. Seed and mulch topsoiled area. <br />2060 <br />104 000 <br />4 <br />Mine in Mining Area 3, Place topsoil on the sideslopes and pit flo <br />29.6 <br />2090 <br />of Mining Area 2. Seed and mulch topsoiled area. <br />2090 <br />104 000 <br />5 <br />Mine in Mining Area 4, Place topsoil on the sideslopes and pit floo <br />27.9 <br />2118 <br />of Mining Area 3. Seed and mulch topsoiled area. <br />2118 <br />104 000 <br />6 <br />Mine in Mining Area 5, Place topsoil on the sideslopes and pit flo <br />4.0 <br />2122 <br />of Mining Area 4. Seed and mulch topsoiled area. <br />2122 <br />_ <br />7 <br />Remove scale and mobile equipment. Place stockpiled topsoil on the <br />pit floor and sideslopes of Mining Area 5 and the pit floor of the <br />1.0 <br />2123 <br />existing pit area. Seed and mulch topsoiled area. <br />Total <br />105.1 <br />like the plant area, in pit roads, Mining Area 5 and portions of Mining Area 4. All other mining <br />areas will receive topsoil directly from surrounding mining areas. The compacted areas will be <br />ripped prior to topsoil placement the help root penetration past the topsoil. <br />3. Haul Roads and Access <br />Portions of the existing roads in the permit area will be removed and others altered. See Map F -1 <br />for details. Access through the site will remain after mining. <br />4. Reclamation Timetable <br />The timetable for reclamation is shown below in Table E -2. Reclamation Timetable. Exhibit <br />L: Reclamation Costs describes the worst case bond scenario. <br />Table E -2 Reclamation Timetable <br />The timetable above is based on sales of 100,000 tons per year. The life would be greatly <br />reduced if this production increases in the future. <br />Uncompahgre Pit, February 2013 E -2 <br />