Laserfiche WebLink
7. Import Fill, Recycled Concrete and Asphalt <br />The pit will accept concrete and asphalt materials that have been removed from existing sites in <br />order that they can be recycled through the plants on site. Fill material may also be accepted into <br />the mine site. Fill material will be spread out on the mined out pit floor and will be blended into <br />the final landscape. Some material may also be re -sold as construction material. None of this <br />material can be accepted by the Operator unless the attached form is filled out by the entity <br />bringing the material to the site. The form provides an assurance that all material brought to the <br />site is inert and has no toxic or acid forming material above acceptable limits. <br />Uncompahgre Pit, February 2013 D -11 <br />