My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-12_PERMIT FILE - M2013007 (16)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013007
>
2013-02-12_PERMIT FILE - M2013007 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:06 PM
Creation date
2/13/2013 7:43:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013007
IBM Index Class Name
PERMIT FILE
Doc Date
2/12/2013
Doc Name
New 112c Application
From
Rocky Mountain Aggregate and Construction, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The portable asphalt plant will consist of burner fuel tanks, asphalt cement tanks, mixer drum, <br />loading hopper and a control room. Asphalt batching operation will only be conducted in the <br />warmer months as it can only be installed in these months. The asphalt plant may be stored on <br />site during the winter months depending on the projects schedules. Excess asphalt produced <br />during batching operations as well as spillage will be cleaned up daily and placed in an asphalt <br />material storage location. The asphalt material will be directly recycled into the mixer drum on <br />the next asphalt production run. <br />No permanent structures will be built within the mining area. The control rooms, scale house, <br />truck scales and plants will be portable, although the scale will have a concrete foundation. The <br />office and shop will be constructed in the office and shop area, as shown on Map C -2A. <br />Maintenance vehicles will visit the site regularly to provide oil, grease, and perform other minor <br />maintenance on vehicles and equipment. Any major repair work required will be performed in <br />the shop. <br />The following list is the best estimate of the required equipment to be used onsite throughout the <br />mine life: <br />Gravel Crushing Equipment <br />• Portable Jaw Crusher <br />• Portable Cone Crusher <br />• Portable Screen Decks <br />• Portable Stacking / Transporting Conveyors <br />• Water Truck for dust suppression <br />• Portable Generators for plants <br />• Electric Control Van <br />• Wheel Loader Cat 988, Cat 980 <br />• Cat D -9 size dozer or equivalent <br />• Portable Wash Plant <br />• Portable Concrete Plant and Mixer Trucks <br />• Portable Asphalt Plant and Highway Haul Trucks <br />Uncompahgre Pit, February 2013 D -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.