Laserfiche WebLink
Task description: <br />Peabody Seneca II- W/Yoast <br />Site: Monitor Wells <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />003 <br />2/7/2013 <br />ERR <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Average push gradient: <br />Average site altitude: <br />Cat D6T <br />185 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />MATERIAL QUANTITIES <br />1,760 <br />1.125 <br />1,980 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />0% <br />7,000 feet <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Regrade Access Road <br />State: Colorado <br />County: Routt <br />$30.43 <br />$57.97 <br />$0.00 <br />$37.41 <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />DRMS <br />Material weight: 2,650 lbs /LCY <br />Cat Handbook <br />Unadjusted hourly production: 153.6 LCY /hr <br />BULLDOZER WORK <br />Permit Action: <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />0.750 <br />0.900 <br />AM 1 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Division of Reclamation, Mining & Safety <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Source <br />(AVG.) <br />(CAT HB)) <br />Page 1 of 2 <br />Permit/Job #: X199016823 <br />Abbreviation: None <br />Filename: X168 -003 <br />CIRCES Cost Estimating Software <br />