Laserfiche WebLink
Action <br />Start <br />Finish <br />Contractor prepare scoping materials, mailing list, etc. for UFO /FS <br />approval <br />11/5/2012 <br />12/7/2012 <br />Proposed Action /Purpose and Need to UFO /FS for review /approval <br />12/4/2012 <br />30 -day scoping period <br />1/23/2013 <br />2/22/2013 <br />Contractor summarize scoping comments; send to UFO /FS for review <br />2/25/2013 <br />3/1/2013 <br />UFO /FS review <br />3/4/2013 <br />3/8/2013 <br />UFO /FS /Contractor determine EA scope based on comments (call or <br />mtg); determine if BA is necessary; Company to be included in mtg. <br />3/8/2013 <br />Contractor — work on EA <br />11/5/2012 <br />3/15/2013 <br />Draft EA to UFO and FS for review <br />3/18/2013 <br />4/19/2013 <br />Track changes to Contractor; Contractor to consolidate comments and <br />revise EA <br />4/22/2013 <br />5/3/2013 <br />Contractor provides revised EA to UFO /FS for review; UFO /FS send to <br />BLM State Office /FS Supervisor for review <br />5/6/2013 <br />6/3/2013 <br />Changes to Contractor for revision; coordinate revisions with UFO /FS <br />6/3/2013 <br />6/17/2013 <br />Draft EA out for comment — 30 -day <br />6/24/2013 <br />7/25/2013 <br />Based on comments determine final changes to EA — <br />Contractor /BLM /FS (conf. call or mtg.) <br />8/1/2013 <br />Draft of Final EA/Draft FONSI /DR to UFO /FS <br />7/25/2013 <br />8/19/2013 <br />BLM /FS review (if significant comments, other reviews maybe needed) <br />8/19/2013 <br />9/13/2013 <br />Final EA/FONSI /DR to BLM /FS <br />9/30/2013 <br />FS — decision to consent on FS lands - and 45 day appeal period <br />10/7/2013 <br />11/21/2013 <br />FS 45 day Appeal Resolution Period - if needed <br />11/22/2013 <br />1/6/2014 <br />BLM — final decision and 30 -day appeal period <br />1/13/2014 <br />2/12/2014 <br />Attachment A <br />Schedule <br />Note — FS 21 day blackout period for decision dates begins Sept 16 making October 7 the earliest <br />date for a decision and forcing the Appeal Resolution Period to start on Nov. 22, 2013. <br />1 Additional review(s) may be needed, depending on adequacy of changes made. Schedule will be adjusted if <br />additional review is needed. <br />