My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-28_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2013-01-28_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:25 PM
Creation date
2/12/2013 8:50:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
1/28/2013
Doc Name
MOU Between BLM, USFS and DRMS
From
BLM
To
DRMS
Permit Index Doc Type
Other Permits
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action <br />Start <br />Finish <br />Contractor prepare scoping materials, mailing list, etc. for UFO /FS <br />approval <br />11/5/2012 <br />12/7/2012 <br />Proposed Action /Purpose and Need to UFO /FS for review /approval <br />12/4/2012 <br />30 -day scoping period <br />1/23/2013 <br />2/22/2013 <br />Contractor summarize scoping comments; send to UFO /FS for review <br />2/25/2013 <br />3/1/2013 <br />UFO /FS review <br />3/4/2013 <br />3/8/2013 <br />UFO /FS /Contractor determine EA scope based on comments (call or <br />mtg); determine if BA is necessary; Company to be included in mtg. <br />3/8/2013 <br />Contractor — work on EA <br />11/5/2012 <br />3/15/2013 <br />Draft EA to UFO and FS for review <br />3/18/2013 <br />4/19/2013 <br />Track changes to Contractor; Contractor to consolidate comments and <br />revise EA <br />4/22/2013 <br />5/3/2013 <br />Contractor provides revised EA to UFO /FS for review; UFO /FS send to <br />BLM State Office /FS Supervisor for review <br />5/6/2013 <br />6/3/2013 <br />Changes to Contractor for revision; coordinate revisions with UFO /FS <br />6/3/2013 <br />6/17/2013 <br />Draft EA out for comment — 30 -day <br />6/24/2013 <br />7/25/2013 <br />Based on comments determine final changes to EA — <br />Contractor /BLM /FS (conf. call or mtg.) <br />8/1/2013 <br />Draft of Final EA/Draft FONSI /DR to UFO /FS <br />7/25/2013 <br />8/19/2013 <br />BLM /FS review (if significant comments, other reviews maybe needed) <br />8/19/2013 <br />9/13/2013 <br />Final EA/FONSI /DR to BLM /FS <br />9/30/2013 <br />FS — decision to consent on FS lands - and 45 day appeal period <br />10/7/2013 <br />11/21/2013 <br />FS 45 day Appeal Resolution Period - if needed <br />11/22/2013 <br />1/6/2014 <br />BLM — final decision and 30 -day appeal period <br />1/13/2014 <br />2/12/2014 <br />Attachment A <br />Schedule <br />Note — FS 21 day blackout period for decision dates begins Sept 16 making October 7 the earliest <br />date for a decision and forcing the Appeal Resolution Period to start on Nov. 22, 2013. <br />1 Additional review(s) may be needed, depending on adequacy of changes made. Schedule will be adjusted if <br />additional review is needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.