Laserfiche WebLink
Susan Burgmaier <br />Sincerely, <br />-2- February 8, 2013 <br />BOW -2: The west half of Gob Pile #4 has been regraded and the slopes exceed or <br />meet the 2H:1 V standard established by BGI. To bring the east half of the pile up to <br />grade, mostly fill is required, in some areas over four feet. Due to current weather <br />conditions, achieving compaction in those areas of fill is very difficult. As discussed with <br />DRMS on January 31, at this time BRL requests approval for the west half of gob pile <br />#4, and will seek approval for the upper east half once the weather improves and <br />compaction can be achieved. <br />Approval for the west half of gob pile #4 will allow BRL to place coverfill material on that <br />half of the pile. BRL understands that no cover material can be placed on the east half <br />of the pile as shown on the attached drawing until it is brought to grade and approved by <br />DRMS. A line of stakes delineating the break between the east and west half of the pile <br />will be clearly marked, and the stakes on the east half of the pile will remain in place, to <br />the extent possible, until final grading can occur. <br />In addition, the first bench of gob pile #4 did not require any grading work and is <br />therefore included in this request for approval. Approving the first bench of gob pile #4 <br />will allow BRL to begin implementing the expansion of gob pile #2 as approved by TR- <br />76. <br />Page 4 of Volume IX has been revised to reflect the as -built configuration; slopes that <br />range from 2H:1V to 3H:1 V. <br />Since the approval of TR -76 occurred before the approval of TR -75, a majority of the <br />map revisions associated with TR -75 are redundant. Therefore, the only changes to be <br />incorporated into the TR -75 final approval are Page 4, and the BGI stability analysis <br />(dated November 20, 2012). <br />Please fee free to contact me if you have any questions. <br />�asr�r� i4i�� <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures: <br />Volume IX: Gob Pile #1 as -built drawing (for review only), Page 4 <br />