Laserfiche WebLink
2ckoro& Ouvvt i v ime, <br />D. Approval of this plan does not relieve me of my responsibility to comply with other applicable <br />state or federal laws, rules, or regulations. <br />E. If previously undiscovered cultural resources (historic or prehistoric objects, artifacts, or sites) <br />are exposed as a result of operations, those operations will not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating unforseen impacts as <br />required by 36 CFR 228.4(e) and 36 CFR 800 have been complied with. <br />F. This plan of operations has been approved for a period of or until tev W p9X 3.( 26( 7 <br />A new or revised plan must be submitted in accordance with 36 CFR part 228, subpart A, if <br />operations are to be continued after that time period. <br />I /We have reviewed and agreed to comply with all conditions in this plan of operations including the <br />required changes, modifications, special mitigation, and reclamation requirements. I/We understand <br />that the bond will not be released until the Authorized Officer in charge gives written approval of the <br />reclamation plan. <br />or Authorized Representative) <br />t(?0 <br />ame) <br />VIII. OPERATING PLAN ACCEPTANCE <br />(Authyr'i�k �f� fficer) <br />IX. OPERATING PLAN APPROVAL <br />RECEIVED <br />FEB <br />Division of Reclamation, <br />Mining & Safety <br />2t7 J )ue // <br />(Date) <br />(5 ;> <br />(Date) <br />