Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />17 e (ti l 11 !jam 7 0, l d 1 ,'$ re-L .,- b 4 bl e c_ <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />litefe toil/ he_ L'c' Dr; II lioleS <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Cue_ Lo j 1 l Back 11 ai S i e or e4 S0 h [mil <br />Wt' 11 c I-la t'e C lewd L,ei e l bcc/ <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />171er Lv 11 - c R oc d 'STr- hekRCc <br />