My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-11_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-02-11_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:04 PM
Creation date
2/11/2013 1:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/11/2013
Doc Name
Decision Letter & Form
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR75
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Technical Revision No. 75 <br />Stipulation No. Description <br />29 Prior to placement of cover on the eastern portion of Gob Pile #4, BRL <br />must survey the eastern portion of the pile to verify that slopes are not <br />steeper than 2:1 and regrade any slopes as necessary to ensure conformity <br />with the approved slope design. Documentation of the corrected slopes <br />must be submitted to and approved by the Division before cover can be <br />placed on the eastern portion of the disposal area. The area to be surveyed <br />and regraded is depicted on the February 8, 2013 review drawing submitted <br />with the Technical Revision No. 75 application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.