My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-08_REPORT - C1981018 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2013-02-08_REPORT - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:58 PM
Creation date
2/8/2013 2:45:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
2/8/2013
Doc Name
4th Quarter 2012 Waste Bank Inspection Letter
From
DRMS
To
Blue Mountain Energy
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />C O L O RA D O <br />P I v I S l o N o f <br />Denver, Colorado 80203 <br />RECLAMATION <br />Phone: (303) 866 -3567 <br />N <br />I NIN G <br />MINING <br />FAX: (303) 832 -8106 <br />SAFETY <br />February 8, 2013 <br />John W. Hickenlooper <br />Governor <br />Scott Wanstedt <br />Blue Mountain Energy <br />3607 County Rd. 65 <br />Mike King <br />Executive Director <br />Rangely, CO 81648 <br />Loretta E. Pineda <br />Director <br />RE: Deserado Mine — Permit No. C- 1981 -018 <br />Professional Certification for the Coal Processing Waste Banks <br />Mr. Wanstedt, <br />The Division finds Deserado Mine's, C- 1981 -018, Coal Processing Waste Bank Report for the fourth quarter in 2012 in <br />compliance with the following rules: <br />• 4.10.2(1) — The mine waste bank was inspected, on behalf of the person conducting surface coal mining <br />operations, by a qualified registered engineer. <br />• 4.10.2(2)(a) — The inspection occurred quarterly as required by the Division. <br />• 4.10.2(2)(b) — Inspections included observations and tests necessary to evaluate the potential hazard to human life <br />and property and to ensure that all organic material and topsoil have been removed and that proper construction <br />and maintenance are occurring in accordance with the plan submitted under 2.053(8) and approved by the <br />Division. <br />• 4.10.2(2)(c) — The engineer considered steepness of slopes, seepage, and other visible factors which could <br />indicate potential failure. <br />• 4.10.2(2)(d) — Copies of the inspection findings shall be maintained at the mine site. <br />• 4.10.2(3) — No potential hazards were noted in the fourth quarter of the 2012 Coal Processing Waste Bank <br />Report. <br />Maintenance work that occurred this quarter included refuse placement, winter stockpile preparation and winter <br />refuse stockpiling. The Division does not have any questions or comments regarding the 2012 fourth quarter Coal <br />Processing Waste Bank Report for Deserado Mine. If you have any questions, please feel free to contact me at any time. <br />Sincerely, <br />Zach Trujillo <br />Environmental Protection Intern <br />(303) 866 -3567 ext. 8164 <br />Zach.Trujillo @state.co.us <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.