Laserfiche WebLink
August <br />September <br />Final baseline groundwater sampling 8/19/03 <br />Scheduled start of mining operations <br />P.\ Data\ GEN\ F -S-P -T \22121 \ Permitting \Stipulation Response \Groundwater Sampling Plan \Condition 1 Groundwater Sampling Plan 2_28_03.doc <br />5 <br />