Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT /DAY) <br />Spoil pile: 0.800 (FND -RF) <br />Push gradient: 1.115 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.868 (CAT HB) <br />Blade type: 1.000 (PAT) <br />Net correction: 0.4338 <br />Adjusted unit production: 705.79 LCY,9tr <br />Adjusted fleet production: 705.79 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Doze (s) <br />Unit cost: $0.292/LCY <br />Total job time: 0.17 Hours <br />Total job cost: S34.61 <br />CIRCES Cost Estimating Software <br />