Laserfiche WebLink
Task description: <br />Site: Pit 1 <br />Task <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: ___1/28/2013 <br />User: WHE <br />Agency or organization name: DR' <br />TASK LIST (DIRECT COSTS) <br />e- <br />Summary of cost for reclamation tasks <br />State. Colorado <br />County: Costilla <br />Description <br />001 Highwall reduction <br />002 Grade & rip, prepare for topsoil replacement <br />003 Topsoil replacement <br />004 t Revegetate 5 acres affected lands. <br />005 Haul reclamation equipment to and from job site <br />006 Remove misc debris, assume 5'Hx5'Wx51 <br />$0.50 /cf <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $263.80 <br />Performance bond: 1.05 Total = S137.12 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $1,305.94 <br />TOTAL O & P = $1,706.86 <br />CONTRACT AMOUNT (direct + O & P) _ $14,766.28 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (le .t lhelated costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />COST SUMMARY WORK <br />Permit Action: Routine update PermitiJob#: M1999073 <br />0.00 <br />0.00 <br />5.00 <br />SUBTOTALS: <br />Abbreviation: None <br />Filename: M073 -000 <br />Form Fleet Task <br />Used Size Hours Cost <br />DOZER 1 0.17 ' $34.61 <br />' DOZER 1 . 12.75 1 52,647.85 <br />; DOZER 1 13.09 <br />i $2,681.81 <br />REVEGE 1 0.00 $3,074.25 <br />MOBILIZE 1 7.80 , $4,558.40 <br />i NA 1 2.00 , S62.50 <br />35.81 i $ $13,059.42 <br />Total = 0.00 <br />Total = $0.00 <br />$738.31 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $2,445.17 <br />TOTAL BOND AMOUNT (direct + indirect) = $15,504.59 <br />