Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EOLTIPMEN'T HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: _ ALAMOSA <br />Total one -way travel distance: 58.00 miles <br />Average Travel Speed: 40.00 mph <br />Total Non - Roadable Mob/Demob Cost * $4,558.40 <br />' * two round trips with haul rig: <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: 50.00 <br />Non- Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 1.45 1.45 <br />Return Time (Hours): 1.45 I 1.45 _ <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 3.90 2.90 <br />Total job time: <br />Total job cost: $4,558.40 <br />7.80 Hours <br />CIRCES Cost Estimating Software <br />