My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-07_REPORT - M1999073
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999073
>
2013-02-07_REPORT - M1999073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:57 PM
Creation date
2/8/2013 2:25:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999073
IBM Index Class Name
REPORT
Doc Date
2/7/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
WHE
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EOLTIPMEN'T HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: _ ALAMOSA <br />Total one -way travel distance: 58.00 miles <br />Average Travel Speed: 40.00 mph <br />Total Non - Roadable Mob/Demob Cost * $4,558.40 <br />' * two round trips with haul rig: <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: 50.00 <br />Non- Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 1.45 1.45 <br />Return Time (Hours): 1.45 I 1.45 _ <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 3.90 2.90 <br />Total job time: <br />Total job cost: $4,558.40 <br />7.80 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.