Laserfiche WebLink
4.0 2012 Project Activities <br />4.1 On -Site Facilities and Process Description <br />4.1.1 General Arrangement <br />Figure 4 provides an overview of the process flow. <br />4.1.2 Lab Operation / Sanitation/ ISO <br />In 2012, lab activities continued to provide analysis for process control, quality assurance, <br />and regulatory requirements. <br />• Plant operators performed process control analyses. <br />• Chloride levels were monitored on all USP grades to ensure USP standards were <br />met. <br />• The USP test for insolubles was conducted on a per lot basis and a filter test for <br />insolubles was conducted on the dry product once per shift by operations. <br />• Pests were controlled with the use of two UV bug lights, rodent traps around the <br />interior and exterior walls of the plant, and the utilization of a sonic bird repeller in <br />the warehouse. <br />• GMP /ISO /Sanitation training was provided for all employees as required. <br />• A food safety and GMP audit was conducted by AIB International. From this audit, <br />NSI received a passing grade. <br />• FDA, CDPHE, NSF, OMRI, Kosher, and ISO 9001 certifications were maintained. <br />4.1.3 Process, Utilities, Facilities <br />The plant was expanded to accommodate a new boiler in order to increase NSI's <br />production capacity while at the same time reducing emissions in 2011 and continued <br />into 2012. New boiler was brought online in 2012. Figure 4 illustrates the general <br />process flow. Work is progressing on NSI's plant expansion to add a second production <br />line. <br />Daub & Associates, Inc. 7 NSI Annual Report 2012 <br />