My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-01_REPORT - M1983194 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983194
>
2013-02-01_REPORT - M1983194 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:40 PM
Creation date
2/6/2013 3:39:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REPORT
Doc Date
2/1/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 2012 Project Activities <br />4.1 On -Site Facilities and Process Description <br />4.1.1 General Arrangement <br />Figure 4 provides an overview of the process flow. <br />4.1.2 Lab Operation / Sanitation/ ISO <br />In 2012, lab activities continued to provide analysis for process control, quality assurance, <br />and regulatory requirements. <br />• Plant operators performed process control analyses. <br />• Chloride levels were monitored on all USP grades to ensure USP standards were <br />met. <br />• The USP test for insolubles was conducted on a per lot basis and a filter test for <br />insolubles was conducted on the dry product once per shift by operations. <br />• Pests were controlled with the use of two UV bug lights, rodent traps around the <br />interior and exterior walls of the plant, and the utilization of a sonic bird repeller in <br />the warehouse. <br />• GMP /ISO /Sanitation training was provided for all employees as required. <br />• A food safety and GMP audit was conducted by AIB International. From this audit, <br />NSI received a passing grade. <br />• FDA, CDPHE, NSF, OMRI, Kosher, and ISO 9001 certifications were maintained. <br />4.1.3 Process, Utilities, Facilities <br />The plant was expanded to accommodate a new boiler in order to increase NSI's <br />production capacity while at the same time reducing emissions in 2011 and continued <br />into 2012. New boiler was brought online in 2012. Figure 4 illustrates the general <br />process flow. Work is progressing on NSI's plant expansion to add a second production <br />line. <br />Daub & Associates, Inc. 7 NSI Annual Report 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.