Laserfiche WebLink
PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M12005MT <br />ENGINEERING TECHNICIAN: Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Wednesday, Oct/3/2012 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />Tuunhert nub Azzariatez <br />PROJECT NUMBER: M12005MT <br />TEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />(IN) <br />LABORATORY <br />PROCTOR <br />DENSITY <br />(PCF) <br />OPTIMUM <br />MOISTURE <br />CONTENT <br />( %) <br />DRY <br />DENSITY <br />(PCF) <br />MOISTURE <br />CONTENT <br />( %) <br />RELATIVE <br />COMPACTION <br />( %) <br />SOIL TYPE <br />379 <br />RPEE - 01 <br />8 <br />97.5 <br />12.0 <br />101.1 <br />13.3 <br />100 <br />Coal gob, black <br />380 <br />RPEE - 02 <br />8 <br />97.5 <br />12.0 <br />101.0 <br />11.5 <br />100 <br />" <br />381 <br />RPEE - 03 <br />8 <br />97.5 <br />12.0 <br />98.4 <br />12.6 <br />100 <br />" " <br />382 <br />Colluviums ramp, east side <br />of the gob pile, bottom <br />Existing <br />grade <br />8 <br />107.0 <br />15.0 <br />118.8 <br />11.0 <br />100 <br />" <br />383 <br />Colluviums ramp, east side <br />of the gob pile, middle <br />8 <br />107.0 <br />15.0 <br />108.4 <br />9.4 <br />100 <br />" <br />384 <br />Colluviums ramp, east side <br />of the gob pile, top <br />" <br />8 <br />107.0 <br />15.0 <br />117.5 <br />10.0 <br />100 <br />" <br />PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M12005MT <br />ENGINEERING TECHNICIAN: Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Wednesday, Oct/3/2012 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />Tuunhert nub Azzariatez <br />PROJECT NUMBER: M12005MT <br />