Laserfiche WebLink
2/5/13 State.co.us Executive Branch Mail -West Elk Mine C- 1980 -007- 4Q12 Refuse Pile Inspection Report <br />State <br />of <br />Colorado <br />West Elk Mine C- 1980 -007 - 4Q12 Refuse Pile Inspection Report <br />Stark - DNR, Jim <jim.stark @state.co.us> Tue, Feb 5, 2013 at 12:58 PM <br />To: "Welt, Kathy" <KWelt @archcoal.com> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @ state.co.us>, Mary Rodriguez - DNR <br /><mary.rodriguez @state.co.us> <br />Kathy, <br />The Division has received the 4Q12 refuse pile inspection report for the West Elk Mine. The report was dated 18 <br />January 2013 and received by the Division on 22 January 2013. Thank you for your timely submittal of this report. <br />There were no issues identified with any of the three inspected refuse piles in the 4Q12 inspection (the LRP, <br />RPE and RPEE). During the 4Q12 reporting period work at the RPEE included completing the sediment and <br />freshwater ditches, refuse placement and compaction, colluvail material removal and extending the underdrain up <br />the valley. All of the compaction data shows that at least the minimum required compaction was achieved at the <br />RPEE. Work at the RPE included removing the temporary refuse stockpile and transporting it to the RPEE, <br />excavating additional refuse from the RPE and transporting it to the RPEE and repairing the RPE ditches <br />impacted by the HR -1 slide. No new material was added to the RPE during the 4Q12 reporting period so no <br />compaction data was included in the report. No work was performed at the LRP during 4Q12. This refuse pile <br />report confirms what the Division has seen and noted in its monthly inspection reports at the site. The Division <br />does not have any comments or questions regarding this report. Please let me know if you have any questions <br />or comments. Thanks. <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i k=e29129fcb5 &viev�-- pt &search =i nbox&th= 13cabefc3d3lfO7f 1 /1 <br />