My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-31_REPORT - M1973021 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1973021
>
2013-01-31_REPORT - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:35 PM
Creation date
2/5/2013 7:31:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
REPORT
Doc Date
1/31/2013
Doc Name
Annual Report and Geotechnical Addendum.
From
Tetra Tech
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rock observed in the highwalls was predominantly competent with the following exceptions: <br />• Bench 6700 stations 0 +90 to 3 +00 (new area north of the realigned haul road) and <br />Bench 6640 stations 15 +50 to 16 +50 consisted of altered sillimanitic gneiss that is <br />very poor in quality and appears to be related to the fault zone. Local instability due <br />to overtopping has occurred. The instability is roughly parallel to the zone of weak <br />rock associated with the fault. Extra caution should be taken when developing <br />highwalls in areas where this rock is present. If, during mining, this rock is <br />encountered in areas not mentioned in this report, Tetra Tech should be contacted and <br />the areas evaluated. <br />• Throughout the South Quarry, there are localized zones of more highly fractured and <br />weathered material that will tend to ravel. Raveling will tend to be caught on the <br />underlying benches. Extra care should be taken in these areas. These areas are <br />outlined in the field data section of this report. <br />• Highwalls near the fault zone will be monitored and observed for movement. Care <br />should be taken when removing the weak rock because the strong rock that remains <br />will tend to overhang. Scaling or other methods will likely be necessary to limit <br />overhanging rockfalls. <br />Based on our observations the overall slope conditions are considered stable and warrant <br />primarily operational considerations. <br />13 <br />Morrison Quarry Annual Report 2012 <br />P \23514\ 133 - 2351 4- 13002\Deliverables\Dehv -01 -2012 Annual Report \Annual_ Report_2012_Geotech doc <br />January 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.