My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-31_REPORT - M1973021 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1973021
>
2013-01-31_REPORT - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:35 PM
Creation date
2/5/2013 7:31:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
REPORT
Doc Date
1/31/2013
Doc Name
Annual Report and Geotechnical Addendum.
From
Tetra Tech
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br />This report summarizes geotechnical observations made January 10 and 11, 2013 on the active <br />and inactive mine areas at the Morrison Quarry operated by Aggregate Industries (AI). This <br />report supplements the "2012 Notice of Intent to Continue Mining Operations / Annual Report" <br />for the Morrison Quarry. Joint and foliation attitudes were mapped for areas mined in 2012 in <br />order to characterize the rock mass exposed. Other features affecting stability such as shear <br />zones, faults, or failure surfaces, were described and mapped as well. The field data collected <br />was used to make recommendations regarding the configuration of future mine slopes. This <br />addendum, therefore, provides information required by Permit Amendment #5 (carried over from <br />Permit Amendment #3 and #4) to Mining Permit M- 1973 -021. <br />1.1 Observational Method <br />Previous Permit Amendments describe the "Observational Method ", which is a process of <br />observing highwall development to evaluate the rock mass stability and recommend slope <br />angles. The default perimeter slope configuration at the quarry is conservatively defined at <br />1 H:1 V highwall height to bench width. Ongoing observation of the rock mass is used to alter the <br />default slope configuration when necessary for safety or desirable for production. Annual <br />Geotechnical Addendums as well as Technical Revisions to the Permit convey the information <br />gathered using the Observational Method to the Colorado Division of Reclamation, Mining, and <br />Safety (DRMS) for review. <br />1.2 Site Description <br />The Morrison Quarry is located west of Colorado Highway 8 approximately 1/2 mile north of <br />U.S. Highway 285 in Jefferson County, Colorado as shown on Figure 1. The site is situated in <br />the Front Range foothills west of the Dakota hogback. Mount Falcon Open Space Park is located <br />west of the site. The Quarry currently consists of the North Quarry, in which active mining no <br />longer occurs, but where a repository for undesirable material exists (North Repository); the <br />Central Quarry, in which active mining no longer occurs, and where reclamation is ongoing, and <br />the South Quarry, where active mining continued in 2012. The North Quarry was mined to an <br />approximate elevation of 6220 feet above Mean Sea Level (MSL) utilizing highwalls and <br />benches. No activity occurred in the North Quarry or the North Repository areas in 2012. The <br />Central Quarry was mined to an approximate elevation of 6330 feet above MSL utilizing <br />highwalls and benches and also contains a stabilized highwall located in the northeast section of <br />the quarry. In 2012, material stripped from the South Quarry was placed in the Central Quarry. <br />The South Quarry was mined between approximate elevations of 7450 to 6640 feet above MSL <br />utilizing highwalls and benches. Other activity in the South Quarry included construction, <br />relocation, and maintenance of haul roads as well as overburden stripping. <br />1 <br />Morrison Quarry Annual Report 2012 <br />P \23514\ 133 - 23514- 13002\Deliverables\Deliv -01 -2012 Annual Report \Annual_Report_20I2_Geotech doc <br />January 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.