Laserfiche WebLink
R n P Enterprises — Taylor Pit <br />Exhibit "D" <br />Reclamation Plan <br />A) Reclamation will be done immediately following the removal of limestone <br />deposits. Pit edges will be graded to 3:1 slopes and will be irregularly shaped to <br />promote wildlife habitat. Reclaimed land will be covered with 6 -10 inches of <br />topsoil and reseeded. Pit edges will be replaced with a loader and shaped with an <br />excavator or dozer. <br />B) Back slopes will be graded to not steeper than 3:1. <br />C) Reclamation plan will be implemented at the extraction of limestone deposits. <br />Mining to be done from 2013 - 2043. Reclamation to take place immediately <br />following removal of limestone deposits. After placing and shaping of reclaimed <br />land, 6 -10 inches of topsoil will be spread across reclaimed surfaces and will be <br />seeded as follows per soil conservation office. <br />i Slopes to be graded to 3:1 <br />ii 1 Sainfoin — 2.5 lbs /acre <br />2 Bromine Smooth —1.6 lbs /acre <br />3 Intermediate Wheatgrass — 2.5 lbs /acre <br />4 Pubescent Wheatgrass — 2.25 lbs /acre <br />5 Orchard — 0.3 lbs /acre <br />iii see ii <br />iv Seed will be drilled into topsoil. <br />v 6 -10 inches of topsoil to be replaced on affected areas. <br />D) N/A <br />E) N/A <br />2)Overburden — place and shape of slopes <br />4000 cubic yards at $1.20 /yd = $4800 <br />Topsoil placement — 3200 cubic yds at $1.93 /yd = $6176 <br />Grass seed mix - $428 <br />Trees /shrubs - $628 <br />Seed and tree placement - $1200 <br />Total Reclamation Cost = $13832 <br />