Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />0.800 <br />(CAT HB) <br />1.200 <br />(SLOT) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.329 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5515 <br />Adjusted unit production: 274.26 LCY/hr <br />Adjusted fleet production: 822.78 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $1.167/LCY <br />Total job time <br />Total job cost <br />476.40 Hours <br />$457,240.04 <br />