My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-01_REPORT - C1981018 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2013-02-01_REPORT - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:38 PM
Creation date
2/1/2013 12:40:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REPORT
Doc Date
2/1/2013
Doc Name
28th AHR (Oct 2011-Sept 2012 )
From
Blue Mountain Energy
To
DRMS
Annual Report Year
2012
Permit Index Doc Type
Hydrology Report
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER IN <br />GALLONS/YR <br />GALLONS /MIN <br />Production Equipment 34,440,000 65.53 <br />Ventilation Humidity 9,018,477 17.16 <br />Underground Storage of Thickener Water 4,750,000 9.04 <br />Incidental (pipe leaks, road watering, wash down) 3,444,000 6.55 <br />TOTAL 51,652,477 98.27 <br />WATER OUT <br />Coal Surface Moisture 18,426,510 35.06 <br />Ventilation Humidity 18,808,785 35.79 <br />Pumped Out 5,241,600 9.97 <br />TOTAL 42,476,895 80.82 <br />Water Left Underground 9,175,582 17.46 <br />Water pumped from B seam to D seam 8,424,000 16.03 <br />During the 1996 -1997 period, Deserado Mine started disposing the prep plant thickener <br />water in the mined out area of the D -Seam (the first longwall district). This water would <br />have been otherwise discharged through Pond PP -2. <br />Ingoinq Water The production equipment utilizes water for dust control and cuttings <br />removal in roof bolting. Water used by equipment is based on 365 shifts worked by <br />continuous miner sections and 268 shifts worked by the longwall. The continuous miner <br />sections use 100 gpm and operate about 4 hours per shift (the rest of the time is spent <br />moving, etc.). The longwall equipment uses 200 gpm of water for about 8 hours per shift. <br />The amount of water entering the mine as ventilation intake air humidity is based on <br />monthly mean temperatures from Table II.0 -1 on page II.0 -5 of the Mining Permit and the <br />yearly mean relative humidity of 56% found on page II.E -1 of the Mining Permit. The <br />absolute humidity, the actual amount of water in the air, is calculated from these data <br />using an average ventilation quantity of 408,438 cubic feet per minute. <br />TABLE 2 -2 <br />MINE WATER BALANCE <br />Thickener water transferred underground for storage was estimated at 4,750,000 gallons <br />during the reporting period. This number is based on operational knowledge of the tons <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.