Laserfiche WebLink
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />061 <br />1/16/2013 <br />1:59:25 PM <br />JHB <br />Replace Cover material on DWDA #2 (3" thick) <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost /hour: $801.99 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Scraper Work Team <br />1,613 <br />1,815 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />2,550 lbs /LCY <br />Earth - Dry packed <br />52,800 pounds <br />20.71 LCY <br />SCRAPER TEAM WORK <br />Permit Action: 2011 Midterm Review <br />Equipment Description <br />Cat 627G <br />Cat D9T - 9SU <br />NA <br />NA <br />NA <br />Water Tanker, 5,000 Gal. <br />COSTShift basis: 1 per day <br />Support Equipment <br />CCY <br />LCY <br />Swell factor: 1.125 <br />Map 11, PAP cover requirement. <br />Cat Handbook (subsoil stockpile few rocks so Earth -dry pack <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Page 1 of 2 <br />Permit/Job #: C1981012 <br />Filename: C012 -061 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />60 <br />NA <br />NA <br />NA <br />25 <br />Ownership cost/hour: <br />$63.31 <br />$78.33 <br />NA <br />NA <br />NA <br />$20.80 <br />Operating cost/hour: <br />$179.56 <br />$85.28 <br />NA <br />NA <br />NA <br />$11.64 <br />Ripper op. cost /hour: <br />NA <br />$1.59 <br />NA <br />NA <br />NA <br />$0.00 <br />Operator cost/hour: <br />$30.02 <br />$37.41 <br />NA <br />NA <br />NA <br />$21.17 <br />Unit Subtotals: <br />$272.89 <br />$202.61 <br />NA <br />NA <br />NA <br />$53.60 <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />1 <br />Group Subtotals: <br />Work: <br />$748.39 <br />Support: <br />$0.00 <br />Maint: <br />$53.60 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />061 <br />1/16/2013 <br />1:59:25 PM <br />JHB <br />Replace Cover material on DWDA #2 (3" thick) <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost /hour: $801.99 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Scraper Work Team <br />1,613 <br />1,815 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />2,550 lbs /LCY <br />Earth - Dry packed <br />52,800 pounds <br />20.71 LCY <br />SCRAPER TEAM WORK <br />Permit Action: 2011 Midterm Review <br />Equipment Description <br />Cat 627G <br />Cat D9T - 9SU <br />NA <br />NA <br />NA <br />Water Tanker, 5,000 Gal. <br />COSTShift basis: 1 per day <br />Support Equipment <br />CCY <br />LCY <br />Swell factor: 1.125 <br />Map 11, PAP cover requirement. <br />Cat Handbook (subsoil stockpile few rocks so Earth -dry pack <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Page 1 of 2 <br />Permit/Job #: C1981012 <br />Filename: C012 -061 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />