Laserfiche WebLink
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />060 <br />1/11/2013 <br />1:51:57 PM <br />JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost /hour: $272.89 <br />MATERIAL QUANTITIES <br />Initial volume: 2,100 <br />Loose volume: 2,363 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Replace Topsoil to Pond 004 <br />County: Las Animas <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />Source of estimated volume: <br />2,550 lbs /LCY <br />Earth - Dry packed <br />52,800 pounds <br />20.71 LCY <br />SCRAPER TEAM WORK <br />Permit Action: 2011 Midterm Review <br />State: Colorado <br />Equipment Description <br />Cat 627G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Sunnort Equipment <br />Swell factor: 1.125 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Page 1 of 2 <br />Permit/Job #: C1981012 <br />Abbreviation: None <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Filename: C012 -060 <br />Maintenance Eauipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$63.31 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$179.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost /hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$272.89 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$272.89 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />060 <br />1/11/2013 <br />1:51:57 PM <br />JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost /hour: $272.89 <br />MATERIAL QUANTITIES <br />Initial volume: 2,100 <br />Loose volume: 2,363 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Replace Topsoil to Pond 004 <br />County: Las Animas <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />Source of estimated volume: <br />2,550 lbs /LCY <br />Earth - Dry packed <br />52,800 pounds <br />20.71 LCY <br />SCRAPER TEAM WORK <br />Permit Action: 2011 Midterm Review <br />State: Colorado <br />Equipment Description <br />Cat 627G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Sunnort Equipment <br />Swell factor: 1.125 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Page 1 of 2 <br />Permit/Job #: C1981012 <br />Abbreviation: None <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Filename: C012 -060 <br />Maintenance Eauipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />