Laserfiche WebLink
Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />(min) <br />1 <br />1500.00 <br />4.00 <br />3.00 <br />7.00 <br />1568 <br />0.989 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />(min) <br />1 <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />0.567 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 003 <br />Return Route: <br />Haul Time: <br />Return Time: <br />0.989 <br />0.567 <br />Total Truck Cycle Time: 3.486 <br />Unit cost: $1.617 /LCY Total job cost: $35,379.00 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 551.07 LCY /Hour Adjusted for job efficiency: 457.39 LCY /Hour <br />Truck Unit Production <br />162.82 LCY /Hour Adjusted for job efficiency: 135.14 LCY /Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br />Adjusted hourly truck team production: 405.43 LCY /Hour <br />Adjusted single truck/loader team production: 405.43 LCY /Hour <br />Adjusted multiple truck/loader team production: 405.43 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 53.96 Hours <br />CIRCES Cost Estimating Software <br />