My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-01_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2013-02-01_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:45 PM
Creation date
2/1/2013 12:36:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
2/1/2013
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Leigh Simmons
Type & Sequence
MT6
Email Name
LDS
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />003 <br />1/11/2013 <br />3:19:48 PM <br />JHB <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total work team cost/hour: $655.71 <br />MATERIAL QUANTITIES <br />Initial volume: 17,500 CCY <br />TRUCK/LOADER TEAM WORK <br />Backfill and Regrade Transformer and Rock Dust Cut Slope <br />State: <br />County: <br />Agency or organization name: DRMS <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Truck/Loader Team <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />Colorado <br />Las Animas <br />Equipment Description <br />Generic 10 -12 cy, 6x4 <br />CAT 950H <br />Cat D8T - 8SU <br />Cat D8T - 8SU <br />NA <br />NA <br />Sunoort Eauinment <br />Swell factor: 1.250 <br />Shift basis: 1 per day <br />Loose volume: 21,875 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds /LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 13.36 LCY <br />Abbreviation: None <br />Page 1 of 3 <br />Filename: C012 -003 <br />Maintenance Eauinment <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />25 <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$12.02 <br />$24.98 <br />$63.00 <br />$56.69 <br />NA <br />NA <br />Operating cost/hour: <br />$63.21 <br />$43.03 <br />$26.01 <br />$104.03 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$1.63 <br />$0.00 <br />NA <br />NA <br />Operator cost /hour: <br />$0.00 <br />$35.82 <br />$37.41 <br />$37.41 <br />NA <br />NA <br />Unit Subtotals: <br />$75.23 <br />$103.83 <br />$128.06 <br />$198.13 <br />NA <br />NA <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $329.52 <br />Support: $326.19 <br />Maint: $0.00 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />003 <br />1/11/2013 <br />3:19:48 PM <br />JHB <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Total work team cost/hour: $655.71 <br />MATERIAL QUANTITIES <br />Initial volume: 17,500 CCY <br />TRUCK/LOADER TEAM WORK <br />Backfill and Regrade Transformer and Rock Dust Cut Slope <br />State: <br />County: <br />Agency or organization name: DRMS <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Truck/Loader Team <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />Colorado <br />Las Animas <br />Equipment Description <br />Generic 10 -12 cy, 6x4 <br />CAT 950H <br />Cat D8T - 8SU <br />Cat D8T - 8SU <br />NA <br />NA <br />Sunoort Eauinment <br />Swell factor: 1.250 <br />Shift basis: 1 per day <br />Loose volume: 21,875 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds /LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 13.36 LCY <br />Abbreviation: None <br />Page 1 of 3 <br />Filename: C012 -003 <br />Maintenance Eauinment <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.