My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-14_PERMIT FILE - C1996083
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2013-01-14_PERMIT FILE - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:03 PM
Creation date
2/1/2013 10:24:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
1/14/2013
Doc Name
11/9/2012 Gob Pile #2 Expansion Buckhorn Stability Analysis TR76
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1.0 Analyses Methods and Results from SLIDE modeling <br />Analysis Method <br />Section ID <br />Minimum <br />Factor of <br />Safety <br />Comments <br />Janbu Simplified <br />A -A' <br />1.687 <br />Janbu Simplified <br />D -D' <br />1.717 <br />Janbu Simplified <br />E -E' <br />2.028 <br />Janbu Simplified <br />F -F' <br />1.640 <br />Global Minimum <br />Since the global minimum static F.S. of 1.640 for section F -F" is greater than the long -term <br />static F.S. of 1.5 required in Section 4.09.1 of the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining, the proposed expansion of CWDA Pile #2 appears to <br />meet all of the requirements for reclamation. All of the computed static factors of safety for <br />the cross - sections analyzed were in excess of the required long -term static F.S. of 1.5 as the <br />analysis results in Table 1. indicate. <br />CONCLUSIONS <br />If constructed as recommended, the proposed expansion of CWDA Pile #2 at Bowie Mine <br />#2 appears to provide adequate factors of safety with regard to slope stability of areas to <br />be reclaimed upon completion of the pile expansion. Field and laboratory testing of the gob <br />materials should be continued in order to provide current material properties for use in <br />future modeling of the coal waste piles at the Bowie #2 mine. <br />Thank you for the opportunity to work with you on this long -term project at the Bowie Mine <br />#2. If you have any questions about this analysis, please contact me at (970) 497 -8852 or <br />dan@buckhorngeo.com. <br />Respectfully submitted, <br />� -� C. 2 <br />Daniel C. Quigley, PE, PG <br />Buckhorn Geotech, Inc. <br />Appendices <br />A — Site Plan <br />B— Cross - section A -A', D -D', E -E' and F -F' <br />C— SLIDE® Model results- Sections A -A', D -D', E -E' and F -F' <br />Bowie Mine #2 — CWDA Pile # 2 Expansion PN 05- 126-GEO <br />REVISED Stability Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.