Laserfiche WebLink
Peak Flow Calculations <br />The following peak flow calculations were compiled with SEDCAD. <br />Details of the run -off calculations are shown on the following pages. <br />25 -YR <br />24 HR <br />Event <br />Pond F Drainage 50.2 <br />Flow calculations for the site ditches and culverts are <br />presented in following sections of this exhibit. <br />Spillway Pond F <br />Pond F Emergency Spillway <br />Manning's Equation <br />Flow In a Trapezoidal Channel <br />DEPTH D 0.8 <br />FEET <br />WIDTH W 10 <br />FEET <br />Slope S 0.02 <br />EXPRESS AS DECIMAL <br />Mannings "N" N 0.03 <br />EXPRESS AS DECIMAL <br />SIDE SLOPE X 2 <br />SLOPE = X:1 <br />AREA= (W*D) +(X *D 2)= <br />9.28 Feet2 <br />WETTED PERIMETER= (W) +2 *[((X *D) 2 +D2)'n] <br />13.58 Feet <br />R= AREA/WETTED PERIMETER <br />0.68 <br />V= (1.491N) *(R') *(5112)= <br />5.45 Ft/Sec <br />Q =AXV= <br />50.6 CFS <br />Q REQUIRED - Peak Discharge <br />50.2 CFS <br />Riprap Sizing - Across top of Embankment <br />D50 = Size of Riprap <br />D50 = ((V X S ^.17)/7.58)) "2 <br />D50 = Diameter in feet <br />V =Velocity <br />S = Slope <br />D50 = 0.14 feet 1.64 <br />inches Use Pit Run Material <br />TR -76 App. B -7 11/12 <br />