Appendix A
<br />Coal Mine Waste Disposal Area -
<br />- - - salvage Volumes----- -- -
<br />Area *Topsoil
<br />-- - - _Topsoil_ -i - --
<br />� Ft.
<br />- - -Acres _ _Depth
<br />_ _ _CY Coverfill
<br />- -- -- 1.2 4 453
<br />�- - - - -- -- �- - - '-
<br />-
<br />Initial 0PFIoot Bench _ 3.91 1.2 7,550
<br />Second 50 Foot Bench 7.7 1.2 14,90
<br />Third 50 Foot Bench 5.8 12
<br />_ _11,229
<br />.2 5,614
<br />Fourth 50 Foot Bench 2.9 L-256-1-
<br />Top of Pile 2.3 1.21 4,453
<br />Gob Pile #4
<br />7.4
<br />0.58i 6,9241
<br />Gob Pile #1
<br />2.7
<br />0.51
<br />2,178
<br />Gob #2 West Expansion
<br />1.8,
<br />1.2
<br />3,485;
<br />Gob #2 Expansion -TR76
<br />6.1
<br />1.2
<br />11,8101
<br />(Fill in Draw Between Pile #2 and
<br />#4)
<br />Totals
<br />42.901
<br />72,603
<br />-
<br />Volumes
<br />Reclamation
<br />Area
<br />Topsoil
<br />Topsoil
<br />From
<br />Cover (Regd)
<br />_
<br />Acres
<br />Depth Ft.
<br />I CY
<br />Stockpile
<br />CY
<br />_
<br />Initial 50 Foot Bench
<br />3.9
<br />0.9
<br />5,663
<br />5,663
<br />19,505
<br />Second 50 Foot Bench
<br />5.1
<br />0.9
<br />7,347, 7,347
<br />25,307
<br />-
<br />Third 50 Foot Bench 5.2
<br />0.9
<br />7,594; 7,5941
<br />26,157!
<br />- -
<br />25,557
<br />Fourth OeFoot Bench 5.1
<br />0 7,42Oµ
<br />Top of P .8
<br />- -
<br />0.9
<br />- -
<br />- -
<br />9,917
<br />- 9,917'
<br />-
<br />- -- 34,159
<br />-
<br />Coverfill Pile - 2.3
<br />Gob Pile # 4 10.2
<br />0.9
<br />0.9
<br />3,3401 3,3401
<br />14,810 14,810
<br />n a
<br />- 51,014
<br />-
<br />Gob Pile #1 y 1.1
<br />- -
<br />0.9
<br />-
<br />1 597
<br />,
<br />1,597' - __ 5,501
<br />Gob #2 West Expansion 0.9
<br />- - - --
<br />0.9,
<br />--
<br />0.9
<br />- -
<br />1307, 1 3071
<br />- 11,0 -- 4,501
<br />11,035 11,035 38,010,
<br />Gob #2 Ex ansion -TR76
<br />p
<br />7.6
<br />-�
<br />I _
<br />- - - - - - --
<br />Totals 48.23 66,6901 229,711
<br />- - - - --
<br />SURVCAD Calculated Volumes
<br />In- Place; _ TOTAL:
<br />1 TOTAL:
<br />Volume Salvaged
<br />CY
<br />Tons
<br />CY
<br />COVERFILL PILE
<br />28,432
<br />298,213
<br />Cover
<br />'Topsoil
<br />447,320
<br />Cover
<br />TOPSOIL PILES
<br />50,326
<br />72,521
<br />1.0.8,782
<br />Topsoil _
<br />BORROW AREA
<br />179,281
<br />BORROW AREA TOPSOIL
<br />6,900
<br />- - -
<br />Cut Slo - --R -72 --
<br />Pe R P 'on ) - - - --
<br />Ex ansi
<br />-
<br />- -
<br />-- - - -- - -- -
<br />- - -
<br />'
<br />- -- - -
<br />TOPSOIL T
<br />3,485
<br />1
<br />COVERFILL
<br />Cut Slope (T_R-76 Expansion) **
<br />-
<br />60,900
<br />+
<br />TOPSOIL
<br />-
<br />-
<br />11,810
<br />COVERFILL
<br />29,600
<br />-�- - -
<br />- -- - --
<br />-- -- -
<br />-
<br />NOTES,
<br />* UNIFORM TOPSOIL DEPTH ASSUMED M ORDER TO MATCH QUANTITY CALCULATED
<br />** VALUES CALCULATED AS PART OF PLANNED CUT SURFACE, MATERIAL WILL LIKEL Y BE USED TO
<br />RECLAIM GOB PILE #2 AND WILL NOT BE PLACED IN A STOCKPILE ,
<br />TR -76 App. A 11/12
<br />
|