My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-14_PERMIT FILE - C1996083A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-01-14_PERMIT FILE - C1996083A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:03 PM
Creation date
2/1/2013 7:49:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/14/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR76
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 124 Page 3 of 7 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2400.00 <br />10.00 <br />5.00 <br />15.00 <br />734 <br />3.29 <br />Haul Time: 3.29 minutes <br />Return Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2400.00 <br />-10.00 <br />5.00 <br />-5.00 <br />2938 <br />0.86 <br />Return Time: <br />0.86 <br />minutes <br />Total Scraper team cycle time: <br />5.65 <br />minutes <br />Adjusted for job conditions: <br />320.96 <br />LCY /Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />320.96 <br />LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />320.96 <br />LCY /Hour <br />Unadjusted unit production/hour: 386.70 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 137.97 Hours <br />Unit cost: $1.735 /LCY Total job cost: $76,828.61 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.