Laserfiche WebLink
2.05.3 <br />Bowie -2 MR -123 approved six gob vent holes to be drilled in 2011. They <br />are GVB -B11A, B11B, B12A, B1213, B12C & B13A. MR -124 approved <br />two additional holes to be drilled in 2011. They are GVB -B11 C and 131 2D. <br />Bowie -2 TR -73 approved ten gob vent holes and three exploration holes. <br />They are GVB -B1 2E, GVB -B1 3B, GVB -B1 3C, GVB- B1 3D,GVB -B13E, <br />GVB -B14A, GVB -B14B, GVB -B14C, GVB -B14D, GVB -B14E, SS -6 <br />SS -7 and 2012 -1. <br />Bow -2 MR -133 approved the installation of four utility holes to be installed <br />north of the large ventilation fan above the D -Seam portals. MR -133 also <br />approved the installation of GVB -13F. <br />MR -133 2.05-49- 11/12 <br />