Laserfiche WebLink
Petition for Partial Rele f Financial Warranty <br /> Climax Molybdenum Coin any <br /> Permit #M-77 493 September 1, 1999 <br /> components listed in Section 5.1 for each building also were demolished and eliminated. The <br /> cover letter to the Climax warranty package dated February 8, 1999, recognizes that financial <br /> warranty is not required for those buildings and structures that are removed from service. <br /> The present warranty for the Precon Building and No. 3 Thickener is $41,958 and $37,479, <br /> respectively. Since these structures no longer exist, Climax requests a reduction in warranty for <br /> a total of. $79,437• Figures 32 and 33 show both of these structure sites following the <br /> demolition tasks. <br /> 4.0 SUMMARY—REQUESTED WARRANTY REDUCTION <br /> Table 1 presents a summary of the requested reduction in warranty on a site by site basis. This <br /> spreadsheet breaks down the amounts by specific task that correlates directly with the February <br /> 1999 warranty document. As shown on the table, CMC is requesting a total reduction of <br /> $3,946,492 from the present grand total of$52,434,637. CMC's request represents a reduction <br /> of 7.5 percent. <br /> 100419/C I imax/Report.doc I 1 <br />