Laserfiche WebLink
TABLE 6.1 , Continued <br /> ACRES AFFECTED (BONDED) OR RECLAIMED (BOND RELEASED) AT END OF PHASE <br /> A = Affected R = Reclaimed <br /> AREA # DESCRIPTION OF AREA I II III IV V <br /> 1976-77 1978-82 1983-95 1996-2020 2021-2030 <br /> A R A R A R A R A R <br /> 29 Clinton Creek Canal - - 66 0 66 0 66 0 0 66 <br /> 30 Rock Stockpile - - 31 0 31 0 31 0 0 31 <br /> 31 Mayflower. Tailing Pond - - 388 0 794 0 1165 0 0 1165 <br /> 32 Mayflower. Dam - - 18 0 78 0 70 45 0 70 <br /> 33 Mayflower Pumps & Treatment Plant - - 59 0 59 0 59 0 0 59 <br /> 34 Spill Prevention Dam - - 216 0 216 0 216 0 0 216 <br /> 35 Mayflower. Topsoil Stockpile #1 ,#2 - - 7 0 10 0 10 0 0 10 <br /> 36 No. 1 Canal - - 29 0 29 0 29 0 0 29 <br />