Laserfiche WebLink
RECLAMATIC SURETY <br /> COSTS DETERMINATION <br /> AREA AND WORK DESCRIPTION ( $000 ) ( $000) <br /> 15. NO. 2 DAM <br /> A. Haul waste rock and distribute 160 248 <br /> B. Revegetate 44 acres at average <br /> $1500/acre 66 <br /> C. Maintenance 44 acres 2 <br /> 16 . ROBINSON SERVICE CORRIDOR <br /> A. Revegetate 75 acres at average <br /> $450/acre 34 53 <br /> B. Maintenance 371 acres 19 <br /> 17 . LOWER EAGLE SERVICE CORRIDOR <br /> A. Revegetate 50 acres at average <br /> $400/acre 20 31 <br /> B. Maintenance 222 acres 11 <br /> 18. OXIDE TAILING POND <br /> A. Revegetate 64 acres at $2700/ <br /> acre 173 176 <br /> B. Maintenance 64 acres 3 <br /> 19 . NO. 4 DAM <br /> A. No reclamation 0 1 <br /> B. Maintenance 17 acres 1 <br /> 20 . TENMILE BARGE ACCESS <br /> A. Dismantle (breakeven) <br /> B. Revegetate 10 acres at $350/ <br /> acre 4 6 <br /> C. Maintenance 30 acres 2 <br /> 21 . POND SHOP FACILITY <br /> A. Dismantle ( breakeven) <br /> B. Revegetate 4 acres at $1000/ <br /> acre 4 5 <br /> C. Maintenance 16 acres 1 <br /> 22 . TENMILE TAILING POND <br /> A. Haul rock waste and distribute 4000 5441 <br /> B. Revegetate 524 acres at $2700/ <br /> acre 1415 <br /> C. Maintenance 524 acres 26 <br /> 23 . NO. 3 DAM <br /> A. Haul rock waste and distribute 810 <br /> B. Revegetate 76 acres at average <br /> $1500/acre 114. 929 <br /> C. Maintenance 109 acres 5 <br /> 24 . BELOW CLINTON DAM <br /> A. Revegetate 6 acres at $1000/ <br /> acre 6 7 <br /> B. Maintenance 12 acres 1 <br /> 11-3 <br />