My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-10-02_REVISION - M1977493 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1995-10-02_REVISION - M1977493 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:18 PM
Creation date
1/31/2013 6:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
10/2/1995
Doc Name
Submittal
From
Climax
To
DMG
Type & Sequence
TR8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TITANEnvironmental <br />By PJA Date 1/22/ 6 Subject: Calculate g.w. flux at Mayflower Page - of 3 <br />Chkd By Date i ' Tailings: Ratio to Tenmile Cr. discharge Proj No 4104 -001 <br />Part B Discharge of Tenmile Creek below Mayflower Tailings Area <br />Average monthly low flow (1990 - 1995): <br />(data from Climax Molybdenum Company, in appendix) <br />Q low = (5.66 + 7.09 + 7.21 +9.21 +6.96 +5.88)/6 =7.00 ft /s <br />Ratio of stream discharge to groundwater discharge: <br />R = Q strm/ Q gw <br />R = 7.00 ft /s / 0.0604 ft /s <br />R= 116 <br />This is the ratio of stream water discharge through Tenmile Creek to <br />groundwater discharge into the stream from the Mayflower tailings area at <br />Climax Mine. <br />Therefore, stream water discharge is 116 times greater in volume than ground <br />water discharge at this location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.